About PM Hoist (Rack And Pinion)
PM Hoist (Rack And Pinion) provided by us, is mainly manufactured and supplied by our expert workers, by making use of top grade of raw materials and latest technology. This hoist is widely used for load lifting at the construction sites. Our supplied view lift side is manufactured from high grade iron alloy, to withstand corrosion and load. PM Hoist (Rack And Pinion) is very much appreciated by our customers, in the market. This hoist can be easily purchased by our valuable clients at cheaper prices, in bulk quantities.
Product details
| Power Source | Electric |
| Sizes | Customized |
| Mounting | Trolley |
| Type | Material Hoist |
| Load Capacity | 0-1 ton,1-3 ton |
Specification
| Technical Data | SC - 100 | SC - 160 | SC - 200 |
| Pay Load Capacity | 1000 kg | 1600 kg | 2000 kg |
| Cage Size (L x W x H) | 2 X 1.3 X 2.1 Meters | 3 X 1.3 X 2.1 Meters | 3 X 1.3 X 2.1 Meters |
| Drive Power | 2 X 12.5 HP | 2 X 15 HP | 3 X 15 HP |
| Speed | 0-33 m/min | 0-33 m/min | 0-33 m/min |
| Maximum Lifting Height | 160 Meters | 160 Meters | 160 Meters |
Superior Manual Control for Construction SitesOur PM Hoist (Rack and Pinion) operates entirely through manual control, eliminating the need for computerized systems or automatic features. This simplicity enhances reliability and ensures consistent hoisting performance, making it ideal for the demanding environment of construction sites where straightforward and durable machinery is essential.
Stainless Steel Durability for Extended Service LifeConstructed from high-quality stainless steel, the hoist delivers exceptional resistance to corrosion and wear. Its robust build guarantees a long-lasting service life, minimizing maintenance needs and maximizing productivity. This focus on durability makes it an invaluable asset for both temporary and long-term construction site operations.
FAQs of PM Hoist (Rack And Pinion):
Q: How is the PM Hoist (Rack and Pinion) typically used on construction sites?
A: The PM Hoist is used to lift and lower materials, equipment, or personnel vertically on construction sites. Its rack and pinion design ensures smooth elevation while the manual control system allows operators to manage the lift safely and precisely.
Q: What are the benefits of choosing a manual, non-computerized hoist for site use?
A: A manual, non-computerized hoist offers increased reliability and straightforward maintenance. With fewer electronic components, there is less risk of malfunction, making it more dependable in challenging worksite conditions and easier to repair on-site.
Q: When should one consider using this type of hoist over automated models?
A: This hoist is ideal when simplicity, ease of use, and durability are prioritiesespecially in environments lacking stable electricity, or where operational complexity must be minimized. Its well-suited for small to medium-sized projects where manual control is sufficient and rapid deployment is needed.
Q: Where can these rack and pinion hoists be installed?
A: They are designed for installation at various construction sites, such as high-rises, bridges, or industrial facilities, wherever vertical lifting of heavy materials or personnel is required safely and efficiently.
Q: What is the process for maintaining the PM Hoist (Rack and Pinion)?
A: Regular inspections of the rack, pinion, and manual controlscombined with routine cleaning and lubricationensure optimal performance. Due to its stainless steel construction, the hoist resists rust, significantly reducing upkeep compared to conventional models.
Q: What materials are used, and how do they enhance service life?
A: The hoist is made from premium-grade stainless steel, renowned for its corrosion resistance and mechanical strength. This guarantees a longer operational lifespan, even under frequent use and in harsh outdoor environments.